Thesis

Portland, OR

Architect: LEVER Architects

Structural Engineer: Holmes

GC: Swinerton

Role: Digital Construction Engineer, Timberlab

SF: 40,000

Thesis was another excellent project with the LEVER and Holmes team. This project was designed with consistency in the timber sizing between levels and standard connections. These design choices from the design team, along with accurate detailing and fabrication from our work, led to Timberlab’s fastest install to date with floors assembled at a rate of 6 days/ level. 
Even the most streamlined projects come with detailing complexity. The digital construction team worked through fire protection detailing and comprehensive MEP coordination. Most notably, a showcase CLT stadium stair was a unique challenge for the Timberlab team with complexity in detailing, metal fabrications, sequencing and install. 